Yumaguzinsky Waterworks, Bashkortostan
Hydraulic engineering works
Underground structures of various application, Chief Project Engineer - E. Ryzhankov, 2000 - 2003.
Projection of the grouting adits number 1, 2 and 3, as well as transport approaches (the approach tunnels) to them.
Projection of the construction and building technology of the underground excavations, considering the pressure of groundwater dam.
Drill and Blast department, Chief Project Engineer- Y. Abakshin, 2001-2003.
Projection of the blasting operations of the waterworks.
Projection of the blasting operations near operating and protected objects.